Well I finally got my top done and wearable. It only took me like 4 months lol. Every month I thought to myself, "I need to get this done so I can wear it to bellydance night" and alas it never got finished. This month I actually got done in time. I ended up adding rows to the sleeves until I had 110 rows on each. That took me to nearly a 3/4 length sleeve. I made a twisted cord from the same yarn as the top and used that as a drawstring tie at the bottom. I will probably eventually put a trim around the neckline and the sleeve cuffs and maybe add a button or something for closure, but it was complete enough to be worn out dancing. Here's the completed top, just in time for the holidays:


I completed another knitting project this week, but since that one is destined to become a Christmas gift, I won't post about it until after the holidays.
I plan to take my Pomatomus sock pattern with me during Christmas vacation to give me something to work on in my spare time. Here's the "Londonberry" sock yarn colorway that I am using for it:

I have been spending a lot of time reading lately due to my obsession with the "Twilight Saga" books by Stephenie Meyer. Therefore I have had to split time between reading and knitting and haven't gotten a lot done on the knitting side.